  • Rationing The Cost Of Resources And Time For The Execution Of Works As Part Of The Construction And Technical Expertise
  • UDC 69.009 DOI: 10.33622/0869-7019.2021.02.57-63
    Natalya V. LAZAREVA, e-mail: LazarevaNV@mgsu.ru
    Moscow State University of Civil Engineering (National Research University), Yaroslavskoe shosse, 26, Moscow 129337, Russian Federation
    Alexey Yu. ZINOVIEV, e-mail: z558272@yandex.ru
    JSC Research Center of Construction, 2-ya Institutskaya ul., 6, korp. 1, Moscow 109428, Russian Federation
    Abstract. The article is devoted to the methodological provisions of rationing the time and resources spent on performing works and activities as part of construction and technical expertise, which can be judicial, pre-trial and corporate. Regardless of the institutional affiliation, the prospects for developing standards for individual works and activities, as well as enlarged standards for the entire complex of construction and technical expertise procedures are indicated. The development of such standards should be carried out in accordance with the current provisions of regulatory documents and generally accepted methodological principles in the field of technical and estimated rationing. In this regard, the authors point out that in accordance with this approach, a single norm should contain the cost of working time, material and technical resources, and should also be linked to the quantitative and qualification cast of performers. The development of an enlarged norm on the construction and technical expertise should be carried out by means of calculation based on unit norms. It is noted that these procedures should take into account the use of information models of capital construction objects during construction and technical expertise. The topology of the network schedule of construction and technical expertise, which indicates the sequential nature of the addition of activities and works, is given. This fact indicates the potential of using the informatization in this subject area. It is also obvious that the use of information models will help reduce the cost and time of construction and technical expertise. This fact must be taken into account when rationing this type of activity.
    Key words: rationing, cost of resources and time, construction and technical expertise, informatization, information model, capital construction object, reengineering.
  • REFERENCES
    1. Simanovich V. M., Ermolaev E. E. Implementation of construction, reconstruction, capital repairs of the capital construction object. Normirovanie i oplata truda v stroitel'stve, 2018, no. 12, pp. 4-8. (In Russian).
    2. Ermolaev E. E. Methodological aspects of the new model of development of the construction complex. Internet-zhurnal "Naukovedenie", 2014, no. 1(20), p. 34. (In Russian).
    3. Aleksanin A. V. Features of the influence of external factors on the construction object. Nauchnoe obozrenie, 2017, no. 6, pp. 12-15. (In Russian).
    4. Aleksanin A. V. Perspective directions of development of construction organization. Nauchnoe obozrenie, 2015, no. 10-1, pp. 378-381. (In Russian).
    5. Yazhlev I. K., Popkov A. G., Belogurova O. A. Problems of regulatory support for the introduction of resource-and energy-saving technologies in urban development. Ekonomika i predprinimatel'stvo, 2020, no. 3(116), pp. 1000-1002. (In Russian).
    6. Burenin V. S., Ezerskij V. A., Monastyrev P. V. Research of modern trends in the design of residential buildings in Russia and abroad. Arhitektura i vremya, 2017, no. 5, p. 2. (In Russian).
    7. Klychnikov R. Yu., Monastyrev P. V., Ezerskij V. A. Dependence of the economic efficiency of thermal modernization of a group of residential buildings on the pace of its implementation. Fundamental'nye, poiskovye i prikladnye issledovaniya RAASN po nauchnomu obespecheniyu razvitiya arhitektury, gradostroitel'stva i stroitel'noj otrasli Rossijskoj Federacii v 2017 g. [Fundamental, search and applied research of the Russian Academy of Sciences on scientific support for the development of architecture, urban planning and the construction industry of the Russian Federation in 2017]. Moscow, RAASN Publ., 2018, pp. 254-264. (In Russian).
    8. Klyuev V. D., Zajcev D. A., Zhuravlev P. A. Normative base for cost estimation of capital repairs of multi-apartment buildings. Upravlenie mnogokvartirnym domom, 2015, no. 1, pp. 17-22. (In Russian).
    9. Sborshchikov S. B., Zhuravlev P. A. Nomenclature of works and costs for ensuring the quality of construction products and methods of its identification. Normirovanie i oplata truda v stroitel'stve, 2018, no. 3, pp. 69-73. (In Russian).
    10. Zhuravlev P. A., Sborshchikov S. B. On the use of resource and technological modeling in the formation of investment programs. Vestnik BGTU im. V. G. Shuhova, 2017, no. 7, pp. 198-201. (In Russian).
    11. Zhuravlev P. A. Nomenclature of capital construction objects required for resource and technological modeling. Promyshlennoe i grazhdanskoe stroitel'stvo, 2020, no. 7, pp. 52-57. DOI: 10.33622/0869-7019.2020.07.52-57. (In Russian).
    12. Sborshchikov S. B., Lazareva N. V., Bahus E. E. On the issue of modernization of quality assurance systems for construction of nuclear power facilities. Vestnik grazhdanskih inzhenerov, 2019, no. 1(72), pp. 219-225. (In Russian).
    13. Sborshchikov S. B., Bahus E. E. Multi-Factor parametric model of efficiency of organizational decisions to ensure the quality of construction. Promyshlennoe i grazhdanskoe stroitel'stvo, 2018, no. 12, pp. 60-67. (In Russian).
    14. Lyapin A. V., Lyapin V. Yu. Modern approach to the organization of estimate activity in construction. Nauchnoe obozrenie, 2016, no. 8, pp. 251-255. (In Russian).
    15. Sborshchikov S. B., Lazareva N. V. Formation of an additional effect in managing the cost of an investment project through reengineering activities. Vestnik grazhdanskih inzhenerov, 2020, no. 2(79), pp. 252-263. (In Russian).
    16. Sborshchikov S. B., Maslova L. A., Zhuravlev P. A. Reengineering in construction. Promyshlennoe i grazhdanskoe stroitel'stvo, 2019, no. 7, pp. 71-76. DOI: 10.33622/0869-7019.2019.07.71-76. (In Russian).
    17. Zharov YA. V. Organizational and technological design in construction based on the intelligent planning block. Vestnik grazhdanskih inzhenerov, 2019, no. 6(77), pp. 193-199. (In Russian).
    18. Zharov Ya. V. Information modeling of construction based on block cluster structure. Normirovanie i oplata truda v stroitel'stve, 2019, no. 11, pp. 10-14. (In Russian).
    19. Lazareva N. V., Zinov'ev A. Yu. On the principles of informatization of construction and technical expertise. Promyshlennoe i grazhdanskoe stroitel'stvo, 2020, no. 7, pp. 41-45. DOI: 10.33622/0869-7019.2020.07.41-45. (In Russian).
    20. Lazareva N. V., Zinov'ev A. Yu. Efficiency of organization of claim-related work and construction-technical expertise. Promyshlennoe i grazhdanskoe stroitel'stvo, 2020, no. 8, pp. 60-64. DOI: 10.33622/0869-7019.2020.08.60-64. (In Russian).
  • For citation: Lazareva N. V., Zinoviev A. Yu. Rationing the Cost of Resources and Time for the Execution of Works as Part of the Construction and Technical Expertise. Promyshlennoe i grazhdanskoe stroitel'stvo [Industrial and Civil Engineering], 2021, no. 2, pp. 57-63. (In Russian). DOI: 10.33622/0869-7019.2021.02.57-63.