Published since 1923
DOI: 10.33622/0869-7019
Russian Science Citation Index (RSCI) на платформе Web of Science


  • INFORMATION SYSTEMS IN CONSTRUCTION
  • Life Cycle of Construction Objects at Information Simulation of Buildings and Structures
  • UDC 69.059.4
    Aleksey V. BELYAEV, e-mail: 89150323232@mail.ru
    Sergei S. ANTIPOV, e-mail: a89104584408@gmail.com
    JSC Research Center of Construction, 2-ya Institutskaya ul., 6, Moscow 109428, Russian Federation
    Abstract. The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan - "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling - BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.
    Key words: information modeling, information model, life cycle of construction objects, regulatory base.
  • REFERENCES
    1. Barabash M. S. Chislennoe modelirovanie napryazhenno-deformirovannogo sostoyaniya konstruktsiy s uchetom stadiy zhiznennogo tsikla zdaniy i sooruzheniy [Numerical simulation of the stress-strain state of structures taking into account the stages of the life cycle of buildings and structures]. Dis. Kiev, 2014. 412 p. (In Russian).
    2. Afanasyev A. A., Matveev E. P. Rekonstruktsiya zhilykh zdaniy [Reconstruction of residential buildings]. Moscow, OAO TSPP Publ., 2008. 234 p. (In Russian).
    3. Kuzevanov D. V., Belyaev A. V. Information Modeling of Reinforced Concrete Structures. Promyshlennoe i grazhdanskoe stroitel'stvo, 2017, no. 1, pp. 58-63. (In Russian).
    4. Eastman C. et al. BIM Handbook. A guide to building information modeling for owners, managers, designers, engineers and contractors [Руководство по информационному моделированию зданий для владельцев, менеджеров, дизайнеров, инженеров и подрядчиков]. TH437.B53, 2011. 650 p.
    5. Kozelkov M. M., Antipov S. S. Management of life cycle of load-carrying structures of monolithic steel concrete buildings by means of technology of information modeling. Beton i zhelezobeton, 2016, no. 1, pp. 12-15. (In Russian).
    6. ISO 29481-1:2010. Building information modeling. Information delivery manual. Part 1: Methodology and format [Моделирование информационное в строительстве. Руководство по доставке информации. Часть 1. Методология и формат].
    7. ISO 29481-2:2012. Building information modeling. Information delivery manual. Part 2: Interaction framework [Моделирование информационное в строительстве. Руководство по доставке информации. Часть 2. Инфраструктура взаимодействия].
    8. National BIM Standard - United States. Version 2. International BuildingSMART [Национальный стандарт по информационному моделированию BuildingSMART]. National Institute of Building Sciences BuildingSMART alliance. 2012.677 p.
    9. PAS 1192-2:2013. Specification for information management for the capital/delivery phase of construction projects using building information modelling [Правила управления информацией на стадии капитального строительства с использованием информационного моделирования]. BSI, 2013. 183 p.
    10. PAS 1192-3:2014. Specification for information management for the operational phase of assets using building information modelling [Правила управления информацией на стадии эксплуатации объекта с использованием информационного моделирования]. BSI, 2014. 44 p.
    11. RIBA Plan of Work 2013 [План работ RIBA 2013 (Королевский Институт Британских Архитекторов]. London, Dale Sinclair, 2013. 40 p.
    12. BIM Overlay to the RIBA Outline Plan of Work [Дополнение по информационному моделированию к плану работ RIBA (Королевский Институт Британских Архитекторов)]. London, RIBA Publishing, 2012.
    13. International Federation for Structural Concrete. The fib model code for concrete structures [Модельный код для бетонных конструкций 2010. Международная федерация по конструкционному бетону]. Berlin, Wilhelm Ernst & Sohn, 2013.
    14. Kreider R. G., Messner J. I. The Uses of BIM: classifying and selecting BIM Uses [Задачи информационного моделирования. Классификация и выбор задач]. The Pennsylvania State University, University Park, PA, USA. 2013. 23 p.
    15. Krivoy S. A., Syomin A. I., Popov A. V., Bebyakin B. O. Connection of BIM Uses within the investment project. Construction of Unique Buildings and Structures, 2018, no. 2(65), pp. 20-39. (In Russian).
  • For citation: Belyaev А. V., Antipov S. S. Life Cycle of Construction Objects at Information Simulation of Buildings and Structures. Promyshlennoe i grazhdanskoe stroitel'stvo [Industrial and Civil Engineering], 2019, no. 1, pp. 65-72. (In Russian).


BACK